Monday, 25 May 2026

Delhi HC: Drawing the Line: When Does a Procedural Order Become an “Interim Award” in Arbitration?

Introduction

The Delhi High Court’s decision in Eureka Forbes Ltd v Indian Railway Catering and Tourism Corporation Decided On: 12.05.2026 Citation: MANU/DE/3689/2026 throws sharp light on a recurring but under‑discussed problem in arbitral practice: what happens to a counterclaim when a respondent is proceeded ex parte. In setting aside an arbitral order that outright rejected a duly‑filed counterclaim merely because the respondent was proceeded ex parte, the Court has drawn a clear doctrinal line between procedural case‑management and the final extinguishment of substantive rights.

For judges, arbitrators and practitioners, the judgment is important on three axes: it refines the “interim award vs procedural order” distinction, it constrains the use of ex parte powers under Section 25 of the Arbitration and Conciliation Act, 1996 (“A&C Act”), and it re‑anchors arbitral procedure in the guarantee of equal treatment and fair opportunity under Section 18.

Factual matrix in brief

IRCTC invited bids in 2015 for operation and maintenance of Water Vending Machines (WVMs) at railway stations, pursuant to which Eureka Forbes was awarded a licence for Cluster 02 under a licence agreement dated 14 September 2016. Disputes arose regarding alleged non‑payment of licence fees, leading IRCTC to invoke arbitration and, on failure to agree on an arbitrator, to approach the Delhi High Court under Section 11, which appointed a retired District and Sessions Judge as sole arbitrator.

IRCTC filed its statement of claim on 6 May 2024, Eureka Forbes filed its statement of defence on 24 June 2024, and pursuant to liberty granted by the arbitrator on 3 July 2024, Eureka Forbes filed a counterclaim on 10 July 2024. On 31 July 2024, when no one appeared for Eureka Forbes, the DIAC Deputy Counsel informed the arbitrator that previous counsel had withdrawn, and at the same hearing IRCTC sought two weeks’ time to file its reply to the counterclaim and rejoinder, whereupon the matter was adjourned to 21 August 2024 with directions to circulate the order to the parties by email.

On 21 August 2024, noting that emails sent to some Eureka addresses had bounced while those to two official addresses had not, and that no one appeared for Eureka Forbes, the arbitrator proceeded ex parte against Eureka and, in the same breath, rejected the counterclaim. When Eureka later sought recall of this order and restoration of its counterclaim, the arbitrator held that while the defence would remain on record and Eureka could participate in the proceedings, the rejection of the counterclaim amounted to an (interim) award that he lacked jurisdiction to recall.

The Section 34 challenge and core issue

Eureka Forbes approached the Delhi High Court under Section 34 of the A&C Act to assail both the 21 August 2024 order (proceeding ex parte and rejecting the counterclaim) and the 21 October 2024 order (refusing to recall the ex parte order or restore the counterclaim). The petitioner argued that the rejection of its counterclaim amounted to an “interim award” within Sections 2(1)(c) and 31(6), following IFFCO Ltd v Bhadra Products and Delhi High Court precedents such as Cinevistaas Ltd v Prasar Bharti.

The respondent countered that the orders were purely procedural, particularly the ex parte direction, and hence were not amenable to Section 34 scrutiny; it also contended that the petitioner’s own conduct and repeated non‑appearance justified the arbitrator’s course of action. Thus, the central legal issue became whether the arbitrator’s order, to the extent it rejected a duly‑filed counterclaim contemporaneously with proceeding ex parte, was a challengeable interim award or a non‑justiciable procedural direction.

The triple test for an “interim award”

The Court anchored its analysis in its earlier decision in H.S. Nag & Ors v Asian Hotel (North) Ltd, where it had synthesised statutory text and precedent (including IFFCO) into a three‑part test for identifying an “interim award”. An order qualifies as an interim award if:

  1. It finally adjudicates a substantive dispute or claim between the parties.

  2. Such adjudication attains finality and binding effect in respect of that issue.

  3. The arbitral tribunal becomes functus officio qua that issue, retaining no further adjudicatory discretion over it.

  4. The Court emphasised that mere nomenclature is irrelevant; the inquiry must focus on substance and legal effect. Procedural directions that regulate the conduct of proceedings, even if they affect valuable rights, do not cross the threshold unless they conclusively determine a component of the arbitral reference.

Ex parte direction: procedural, not an interim award

Applying this test, the Court first considered the arbitrator’s decision to proceed ex parte against Eureka in respect of IRCTC’s claims. It held that such a direction, by itself, does not adjudicate any substantive issue, nor does it extinguish the defaulting party’s underlying rights; the claims remain to be decided on the merits.

Crucially, the arbitrator remained in seisin of IRCTC’s claims, retained full adjudicatory discretion, and could even revisit procedural aspects, including the ex parte status, in appropriate circumstances. On this reasoning, the ex parte order was characterised as purely procedural and therefore outside the scope of Section 34 review at this stage, with the Court making it clear that any challenge to such procedural steps could ordinarily be raised when assailing the final award or, in exceptional cases, under constitutional jurisdiction.

From an arbitral‑practice perspective, this part of the ruling is conservative and continuity‑based: it preserves tribunal autonomy over day‑to‑day case‑management, resists fragmentation of arbitral review through piecemeal challenges, and aligns with the policy of minimal curial intervention.

Rejection of the counterclaim: a true interim award

The analysis changes starkly when the Court turns to the rejection of the counterclaim. Here, applying the same triple test, the Court concluded that the arbitrator’s decision satisfied all three elements of an interim award.

First, the rejection of the counterclaim was a conclusive determination of Eureka’s independent substantive claims, leaving nothing further to be adjudicated on those claims in the arbitration. Second, the determination plainly bore an element of finality and binding effect, as the arbitral record treated the counterclaim as dismissed, not merely deferred or held in abeyance. Third, the arbitrator himself proceeded on the footing that he was functus officio qua the counterclaim, expressly holding that he could not recall what he regarded as an award and that any challenge had to be mounted before a court.

In the Court’s words, the orders “taken in conjunction, insofar as they relate to the Petitioner’s counterclaims, constitute an interim award and would be amenable to challenge under Section 34”. This classification is doctrinally significant: it recognises that while ex parte directions are procedural, the outright extinction of an already‑filed counterclaim is qualitatively different and confronts the parties’ substantive rights in a final manner.

Section 18 and the equal‑treatment imperative

Having brought the matter within Section 34, the Court scrutinised the arbitrator’s rejection of the counterclaim on the touchstone of Section 18, which mandates equal treatment of parties and a full opportunity to present one’s case. The arbitral record showed that:

  • The counterclaim was duly filed on 10 July 2024 pursuant to express liberty granted by the arbitrator.

  • On 31 July 2024, the adjournment was substantially driven by IRCTC’s request for time to file its reply to the counterclaim and rejoinder, not solely by Eureka’s non‑appearance.

  • The proceedings on the counterclaim were still at the pleadings stage; there is no indication that IRCTC’s reply had been filed by 21 August 2024.

Against this backdrop, the Court considered it arbitrary and legally untenable to reject a duly‑filed counterclaim solely because the respondent was proceeded ex parte on a single subsequent date, particularly when the adjournment had previously been sought by the claimant itself. The Court underscored that non‑appearance may justify proceeding ex parte but does not, ipso facto, justify striking off substantive claims that are already on record.

The critical point is conceptual: ex parte status affects how the tribunal proceeds (e.g., taking evidence without participation) but does not erase previously crystallised pleadings. To treat ex parte as a trigger for extinguishing a counterclaim is to convert a procedural consequence into a substantive sanction without statutory warrant, in direct tension with Section 18’s guarantee of equal treatment.

Section 25: default, but not dismissal of claims

The Court then turned to Section 25 of the A&C Act, which deals with “default of a party”. While Section 25(a) allows termination of the proceedings if a claimant fails to communicate its statement of claim at all, and Section 25(b) permits the tribunal to proceed without a respondent’s defence, the Court emphasised two limits:

  • Section 25(a) contemplates termination of the proceedings where no claim (or, by implication, counterclaim) is filed; it does not authorise dismissal of claims that have already been validly filed and are on record.

  • Section 25(c) allows the tribunal to continue proceedings and make an award based on available evidence where a party fails to appear or produce evidence; it does not envisage rejection of a substantive claim purely for non‑appearance.

In Eureka Forbes, the counterclaim had been filed; the case was not one of failure to communicate a claim or counterclaim at all. Thus, Section 25(a) was inapplicable, and the statutory scheme, taken as a whole, pointed towards proceeding on merits on the material before the tribunal rather than striking off claims.

The Court therefore held that the arbitrator’s course—rejecting the counterclaim as a direct consequence of proceeding ex parte—was inconsistent with the legislative design of Section 25 and amounted to visiting the party with an “extreme consequence” not contemplated by the Act.

Public policy, patent illegality and “unable to present the case”

Having found jurisdiction under Section 34, the Court identified multiple grounds for setting aside the interim award rejecting the counterclaim.

First, it treated the rejection as being in “conflict with the public policy of India” under Section 34(2)(b)(ii), because it involved a serious violation of principles of natural justice and Section 18’s equal‑treatment requirement. Denying adjudication on a duly‑filed counterclaim, at a stage when even the claimant’s reply was not on record, was held to constitute a manifest failure of procedural fairness.

Second, the Court invoked Section 34(2A) (patent illegality apparent on the face of the award), pointing out that the arbitrator’s approach showed elements of perversity: it misapplied Section 25, ignored the context of the 31 July 2024 adjournment, and treated ex parte status as equivalent to extinguishment of substantive rights.

Third, the Court held that the situation squarely attracted Section 34(2)(a)(iii) — the party was “otherwise unable to present his case”. By rejecting the counterclaim at the threshold of pleading and without merit‑based adjudication, the arbitrator effectively prevented Eureka from ever placing its counter‑case before the tribunal.

This three‑pronged reasoning sends a strong signal: courts will not countenance procedural shortcuts that result in the permanent foreclosure of substantive claims under the guise of case‑management.

Relief: restoration of counterclaim, ex parte order left untouched

On relief, the Court adopted a calibrated approach. It set aside the 21 August 2024 order “insofar as it proceeds ex parte as against the Petitioner and goes on to hold that as the reason for rejecting the counterclaims of the Petitioner”, and restored the counterclaims to their original position, directing the arbitral tribunal to consider them in accordance with law.

However, the Court declined to interfere with the direction that the petitioner be proceeded ex parte in respect of IRCTC’s claims, reiterating that this part of the order was procedural and did not qualify as an interim award. The same logic applied to the later order of 21 October 2024 so far as it related to ex parte status; the Court expressly disclaimed jurisdiction to rule on its correctness under Section 34, leaving Eureka to pursue any other remedies available in law for challenging such procedural directions.

The outcome is therefore asymmetrical but principled: the counterclaim is revived and must be adjudicated; the ex parte posture towards the main claim remains, unless corrected in some other forum or stage.

Critical appraisal: strengths of the Court’s approach

The judgment’s most compelling strength lies in its insistence on conceptual clarity between procedure and substance. By classifying the rejection of the counterclaim as an interim award while treating the ex parte direction as procedural, the Court preserves arbitral flexibility in managing hearings yet protects parties from the irreversible loss of claims without adjudication.

The reliance on H.S. Nag’s triple test is also doctrinally neat: it offers tribunals and courts a workable framework to distinguish challengeable interim awards from unchallengeable interlocutory orders, reducing the risk of ad hoc classifications based on labels or convenience. This clarity is particularly useful in complex arbitrations where multiple orders—on jurisdiction, limitation, bifurcation, or partial claims—are disposed of at different stages.

Further, the judgment correctly reads Section 25 as an enabling, not punitive, provision. It empowers tribunals to continue despite default; it does not authorise them to weaponise default into dismissal of claims that are already alive on the record. That interpretive stance aligns with the pro‑arbitration but fair‑procedure ethos of the A&C Act.

Points of tension and open questions

That said, the judgment raises some interesting questions for arbitral practice. First, while the Court classifies the ex parte order as purely procedural and thus beyond Section 34, the same ex parte posture can, in practice, substantially impair a respondent’s ability to defend, especially at the evidence stage. The Court hints that such grievances may be raised when challenging the final award, but interim prejudice can still be severe.

Second, the judgment assumes that dismissal of a counterclaim for non‑prosecution can never be a legitimate exercise of tribunal discretion where default is repeated and contumacious. While the facts here plainly did not justify such a drastic step, in other cases tribunals may confront respondents who use counterclaims tactically to delay proceedings and then routinely default. The line between robust docket control and extinguishment of rights remains fact‑sensitive and will require careful, record‑based calibration.

Third, by accepting the arbitrator’s own characterisation that he lacked power to recall an “award” on the counterclaim, and instead correcting the position under Section 34, the Court indirectly leaves unresolved the larger question of how far arbitral tribunals can revisit their own interim awards. The judgment does cite Srei Infrastructure v Tuff Drilling (through the arbitral order), but does not itself develop the contours of an arbitral “recall power”, a question that continues to generate debate.

Practical takeaways for arbitrators

For arbitrators, the message is clear and operational.

  • Proceeding ex parte is a procedural step; it should not be mechanically coupled with dismissal of pending claims or counterclaims that are already on file.

  • Even where a respondent defaults on appearance, a filed counterclaim must ordinarily be adjudicated on the basis of available pleadings and evidence, with the tribunal drawing appropriate inferences from non‑participation rather than erasing the claim.

  • When dealing with defaults, orders should clearly identify which consequences flow from Section 25(a), (b) or (c); tribunals should avoid creative “sanctions” not contemplated by the statute.

Tribunals would also be well advised to record, with some care, whether their determinations on specific issues are intended to have finality (and hence the character of awards or interim awards) or are merely procedural directions, to reduce downstream classification disputes.

Practical takeaways for counsel

For counsel, the judgment underscores the importance of both diligence and record‑building.

  • Withdrawal of counsel without formal substitution and without the client being clearly informed of the next dates can expose parties to ex parte consequences; tribunals and institutions will increasingly look at email trails and service records as the Delhi High Court did here.

  • Where a counterclaim (or any independent claim) is struck off during proceedings, counsel should carefully examine whether the order satisfies the H.S. Nag triple test; if it does, a timely Section 34 challenge, even mid‑arbitration, may be necessary to prevent irrevocable loss.

At the same time, parties should not reflexively challenge every adverse procedural order as an “interim award” lest arbitral timelines be derailed and costs escalated.

Conclusion: re‑centring fairness in arbitral default

Eureka Forbes v IRCTC is a useful reminder that ex parte proceedings are a tool for efficiency, not a licence to amputate substantive rights. By restoring a counterclaim that had been rejected merely because counsel failed to appear on a given date, the Delhi High Court has re‑affirmed a simple but vital proposition: in arbitration, as in court, default should not become a backdoor substitute for adjudication.

For the arbitral community, the decision invites greater discipline in distinguishing between case‑management and final dispositions, and in ensuring that even in a regime of party autonomy and minimal court interference, the foundational guarantees of equal treatment and fair hearing remain non‑negotiable.

Print Page

When Procedure Ends and Adjudication Begins: The Law of Interim Awards in Arbitration

 In light of the foregoing discussion and the judicial precedents noticed hereinabove, the governing test for determining whether an order qualifies as an "interim award" may now be articulated.


(a) Whether the Order finally adjudicates a substantive dispute or claims between the parties;


(b) Whether such adjudication attains finality and has a binding effect insofar as that issue is concerned; and


(c) Whether, upon such determination, the Arbitral Tribunal becomes functus officio qua that issue and retains no further adjudicatory discretion thereon. {Para 106}


107. Therefore, if an order answers to all the aforesaid three elements in affirmative, the order transcends the realm of a mere procedural order and assumes the character of an Interim Award within the meaning of Sections 2(1)(c) and 31(6) of the Act, and consequently becomes susceptible to scrutiny under Section 34, subject to its limited and circumscribed scope.

IN THE HIGH COURT OF DELHI

O.M.P. (Comm.) 502/2024 and I.A. 46323/2024

Decided On: 12.05.2026

Eureka Forbes Limited Vs. Indian Railway Catering and Tourism Corporation

Hon'ble Judges/Coram:

Harish Vaidyanathan Shankar, J.

Citation: MANU/DE/3689/2026

Print Page

Wednesday, 15 April 2026

Supreme Court: New grounds containing new material/facts could not have been introduced for the first time in an appeal when admittedly these grounds were not originally raised in the arbitration petition for setting aside the award

The question then arises, whether in the facts and circumstances of the present case, the High Court committed any error in rejecting the appellant's application for addition of new grounds in the memorandum of arbitration appeal. As noticed above, in the application for setting aside the award, appellant set up only five grounds viz., waiver, acquiescence, delay, laches and res judicata. The grounds sought to be added in the memorandum of arbitration appeal by way of amendment are absolutely new grounds for which there is no foundation in the application for setting aside the award. Obviously, such new grounds containing new material/facts could not have been introduced for the first time in an appeal when admittedly these grounds were not originally raised in the arbitration petition for setting aside the award. {Para 28}

IN THE SUPREME COURT OF INDIA

Civil Appeal No. 2928 of 2010 

Decided On: 01.04.2010

State of Maharashtra Vs. Hindustan Construction Company Ltd.

Hon'ble Judges/Coram:

R.V. Raveendran and R.M. Lodha, JJ.

Author: R.M. Lodha, J.

Citation: 2010 INSC 191, MANU/SC/0215/2010.

Read full judgment here: Click here.

Print Page

Supreme court: Do the principles relating to amendment of pleadings in original proceedings apply to the amendment in the grounds of appeal?

 Do the principles relating to amendment of pleadings in original proceedings apply to the amendment in the grounds of appeal? Order XLI Rule 2 CPC makes a provision that the appellant shall not, except by leave of the Court, urge or be heard in support of any ground of objection not set forth in the memorandum of appeal; but the Appellate Court, in deciding the appeal, shall not be confined to the grounds of objections set forth in the memorandum of appeal or taken by leave of the Court. Order XLI Rule 3 CPC provides that where the memorandum of appeal is not drawn up as prescribed, it may be rejected, or be returned to the appellant for the purpose of being amended. {Para 20}


21. The aforesaid provisions in CPC leave no manner of doubt that the appellate court has power to grant leave to amend the memorandum of appeal. As a matter of fact, in Harcharan v. State of Haryana   MANU/SC/0166/1982 : (1982) 3 SCC 408 this Court observed that the memorandum of appeal has same position like the plaint in the suit. This Court said:


...When an appeal is preferred the memorandum of appeal has the same position like the plaint in a suit because plaintiff is held to the case pleaded in the plaint. In the case of memorandum of appeal same situation obtains in view of Order 41, Rule 3. The appellant is confined to and also would be held to the memorandum of appeal. To overcome any contention that such is not the pleading the appellant sought the amendment....

 IN THE SUPREME COURT OF INDIA

Civil Appeal No. 2928 of 2010 

Decided On: 01.04.2010

State of Maharashtra Vs. Hindustan Construction Company Ltd.

Hon'ble Judges/Coram:

R.V. Raveendran and R.M. Lodha, JJ.

Author: R.M. Lodha, J.

Citation: 2010 INSC 191, MANU/SC/0215/2010

Print Page

Wednesday, 25 March 2026

When the Signature Becomes the Case: Delhi High Court on Proof of Contract, Defective Notarisation and the Limits of Section 34 of Arbitration Act



In arbitration, a claim founded on a disputed contract cannot survive unless the contract itself is first proved. The Delhi High Court’s decision in Galaxy Infra and Engineering Pvt. Ltd. v. Pravin Electricals Pvt. Ltd. reaffirms that principle with clarity and commercial realism.

Introduction

The decision of the Delhi High Court in Galaxy Infra and Engineering Pvt. Ltd. v. Pravin Electricals Pvt. Ltd., decided on 11.03.2026, is an important ruling on contract formation, proof of execution, arbitral jurisdiction and the narrow limits of challenge under Section 34 of the Arbitration and Conciliation Act, 1996. The judgment underscores a basic but often neglected truth of commercial litigation: where the very agreement containing the arbitration clause is not proved to have been executed, the arbitral claim may fail at the threshold itself.

Print Page

Tuesday, 2 December 2025

What is difference between Section 34 of arbitration Act and Section 37 of the Arbitration Act?

Understanding the distinction between Section 34 (application for setting aside an arbitral award) and Section 37 (appealable orders) is crucial to grasping the framework of judicial intervention in arbitration. While they operate together in challenging arbitral outcomes, they function at distinctly different stages with fundamentally different scopes.

Nature and Stage of Intervention

Section 34 represents the primary recourse mechanism against a final arbitral award. It permits a party to directly challenge the award itself on specifically enumerated grounds before the Court. This application targets the substantive output of the arbitral tribunal—the award.

Print Page

Sunday, 2 March 2025

Delhi HC: Whether the court should direct deposit of Arbitration award amount U/S 9 of Arbitration Act?

Arbitration -Amount awarded -Deposit of -Sections 9 and36 of Arbitration and Conciliation Act, 1996 -Present petition filed under Section 9 of Arbitration Act seeking deposit of amount awarded to NHAI and restraining respondent from alienating assets -Whether respondent must secure and deposit awarded amount and disclose assets to safeguard enforcement of arbitral award -Held, Section 9 of Arbitration Act permits reliefs before, during, or post-arbitration -Post-award, execution under Section 36 of Arbitration Act is standard for enforcing awards -Courts rarely order deposits under Section 9of Arbitration Act, except in exceptional cases where it's vital to protect award holder -Merely winning award doesn't justify deposit orders -Courts require evidence of risks rendering award unenforceable -Grounds like financial instability or asset movement must be substantiated -NHAI's plea cites stakes involved and respondent's financial condition -It only speculates risks without proof of asset dissipation or unrealisable claims -Concession agreement remains active, and IRB pledged no fund appropriation from escrow until dues clear -Courts apply strict standards to post-award Section 9 of Arbitration Act relief -There must be realisable award and proof of risk making it illusory -Precarious financial conditions alone are insufficient -IRB's substantial investments and commitments negate grounds for immediate deposit -Courts must balance fairness while ensuring awards aren't rendered illusory -Current facts don't justify granting NHAI's requested deposit -Petition dismissed. Deposit under Section 9 of Arbitration Act needs proven risk of award becoming unenforceable, not mere existence of award.

IN THE HIGH COURT OF DELHI

OMP (I) (Comm.) 172/2024

Decided On: 18.10.2024

National Highways Authority of India Vs. IRB Ahmedabad Vadodara Super Express Tollways Pvt. Ltd.

Hon'ble Judges/Coram: C. Hari Shankar, J.

Citation:  MANU/DE/7333/2024, 2024:DHC:8034.
Print Page

Sunday, 29 December 2024

Delhi HC: Award Is Time-Barred U/S 34(3) Of Arbitration Act Due To Petitioner's Failure To Confirm Award Receipt On Affidavit

 In this case, there is a specific instruction for the Administrative Assistant to the Tribunal to serve a copy of the award. Other than the self- serving statements made across the bar that the copy of the award was not received on 23.08.2017 the Petitioner has not shown any document as to whether it has received the award. The contention of the learned Counsel for the Petitioner that the Tribunal has to show as to when did it served the copy of the award on the Petitioner cannot be accepted. In the absence of any positive affirmation on affidavit from the Petitioner as to when was the award received, this Court cannot accept the mere ipse dixit of the Petitioner that as soon as the award was received it was filed by the Petitioner. {Para 24}

IN THE HIGH COURT OF DELHI

O.M.P. (COMM) 49/2018, I.A. 1565/2018, I.A. 4650/2018, I.A. 4659/2018 and I.A. 9614/2018

Decided On: 12.12.2024

Indure Pvt. Ltd. Vs. Aneja Construction (India) Ltd.

Hon'ble Judges/Coram:

Subramonium Prasad, J.

Citation: MANU/DE/9015/2024.

Print Page

Wednesday, 25 December 2024

Supreme Court: S. 14 Limitation Act is Applicable To Proceedings Under Arbitration & Conciliation Act

 Having considered the matter in detail, we are of the

opinion that the issue is covered by the decision of this

court in Consolidated Engg. Enterprises v. Principal

Secretary, Irrigation Dept. 2008 (7) SCC 169. (supra). {Para 9}

10. We may hasten to add that when the substantive remedies

under Sections 34 and/or 37 of the Arbitration Act are by

their very nature limited in their scope due to statutory

prescription, Arbitration and Conciliation Act, 1996.

, it is necessary to interpret the limitation

provisions liberally, or else, even that limited window to

challenge an arbitral award will be lost. The remedies under

Sections 34 and 37 are precious. Courts of law will keep in

mind the need to secure and protect such a remedy while

calculating the period of limitation for invoking these

jurisdictions.

11. Applying Section 14 of the Limitation Act, we hold that

there is sufficient cause for excluding the period commencing

from 20.10.2011 to 23.02.2012. In view of the fact that this

period is excluded, the appellant will be entitled to the

statutory remedy under Section 34 of the Act.

REPORTABLE

IN THE SUPREME COURT OF INDIA

CIVIL APPELLATE JURISDICTION

CIVIL APPEAL NOS.12849-12856/2024

KIRPAL SINGH  Vs GOVERNMENT OF INDIA, NEW DELHI & ORS. 

Dated: November 21,2024. 

Citation: 2024 INSC 944.

Print Page

Supreme Court direct National highway authority of india to make part payment of compensation for acquired land

 Having heard learned counsel for the parties, we deem it appropriate to dispose of the present proceedings with the following directions:

i. The NHAI shall deposit 50 per cent of the compensation amount, as awarded by the Arbitral Court, with the Executing Court within a period of four weeks. The said amount shall be released to the land owners unconditionally.

ii. The learned District Court, before whom the proceedings under Section-34 of the Arbitration Act are pending, shall make an endeavour to decide such proceedings within a period of six months.

iii. The balance amount of compensation as per the Award to be passed under Section 34 of the Arbitration Act, shall be deposited by the NHAI with the Executing Court within four weeks after such determination. The said amount shall also be released by the Executing Court in favour of the landowners subject to the rights and remedies available, to the parties in law. {Para 6}

 In the Supreme Court of India

(Before Surya Kant and Abhay S. Oka, JJ.)

Petition(s) for Special Leave to Appeal (C) No(s). 12409/2022

Project Director National Highways Authority of India Vs Saraswatibai Chandrakant Shinde and Others 

Decided on August 1, 2022

Citation: 2022 SCC OnLine SC 1115.

Print Page

Whether the court can direct part payment of compensation amount during pendency of application challenging arbitration award U/S 34 of Arbitration Act?

7. We disapprove the entertaining of such writ petitions Under Article 226 of the Constitution of India to execute the award passed by the learned Arbitral Tribunal/Court, without relegating the judgment creditor in whose favour the award is passed to file an execution proceeding before the competent Executing Court.


7.1. In view of the above discussion, we would have set aside the impugned judgment and order passed by the High Court on the aforesaid ground alone. However, taking into consideration the similar order passed by this Court in the case of Saraswatibai Chandrakant Shinde (supra), we deem it appropriate to dispose of the present proceedings/appeal with the following directions:


(i) The NHAI shall deposit 50 per cent of the compensation amount, as awarded by the Arbitral Court, with the Executing Court within a period of four weeks. The said amount shall be released to the land owners unconditionally.


(ii) The learned District Court, before whom the proceedings Under Section 34 of the Arbitration Act are pending, shall make an endeavour to decide such proceedings within a period of six months from the next date of hearing before the said court.


(iii) The balance amount of compensation as per the Award to be passed Under Section 34 of the Arbitration Act, shall be deposited by the NHAI with the Executing Court within four weeks after such determination. The said amount shall also be released by the Executing Court in favour of the land owners subject to the rights and remedies available to the parties in law.

 IN THE SUPREME COURT OF INDIA

Civil Appeal No. 5256 of 2022

Decided On: 24.08.2022

National Highways Authority of India Vs. Sheetal Jaidev Vade and Ors.

Hon'ble Judges/Coram:

M.R. Shah and B.V. Nagarathna, JJ.

Author: M.R. Shah, J.

Citation: 2022 SCC ONLINE SC 1070, MANU/SC/1033/2022.

Print Page

Sunday, 22 December 2024

Bombay HC: Arbitral Award can be executed by the court which passed it or by the Court to which it is sent for execution

Conclusion:

26. In the light of aforesaid discussion, we find that after an award attains finality and the stage as contemplated by provisions of Section 34 of the Act of 1996 has been crossed, the final arbitral award under Part-I of the Act of 1996 has to be enforced in accordance with the provisions of the Code in the same manner as if it were a decree of the Court. The legal fiction under Section 36 is only for the limited purpose of enforcement of an award as a decree. At that stage, the provisions of Sections 38 and 39 of the Code would come into operation. These provisions permit a decree to be executed either by the Court which passed it [the Court as defined by Section 2(1)(e)(i) of the Act of 1996] or by the Court to which it is sent for execution. The Court which passed the decree can also transfer it for execution to any subordinate Court of competent jurisdiction. Proceedings for execution of an arbitral award are beyond the purview of Section 42 of the Act of 1996, inasmuch as such proceedings are not in the nature of any application under Part-I of the Act of 1996. The view as taken by the Division Bench in Akola Janta Commercial Co-operative Bank Ltd. [supra] that a decree holder must apply for execution of an award to the Court of District Judge who may thereafter execute the award as a decree himself or send it for execution to another Court including a subordinate Court of competent jurisdiction commends itself and we respectfully concur with the same. The modality prescribed therein that all applications for execution of awards be first placed before the District Judge who may then execute the same himself or send it to subordinate Courts under Section 38 read with Section 39(2) of the Code is found appropriate in these circumstances.

27. We are, therefore, in respectful disagreement with the views expressed in the order of Reference in Gemini Bay Transcription Pvt. Ltd. [supra] that a Court subordinate to the Court of District Judge [here the Court of Principal District Judge] cannot be recognized as a Court of competent jurisdiction for the purposes of enforcement of awards under the Act of 1996. The view taken by learned Single Judge in Arunkumar Deedwania [supra] stands affirmed and the view taken in Sanjay Suryakant Mhaske & others [supra] with respect stands overruled.

30. The Reference accordingly stands answered as follows:-

An Award made under Part-I of the Arbitration and Conciliation Act, 1996 can be executed not only by the Court as defined by Section 2(1)(e)(i) but also by the Court to which it is sent for execution under Sections 38 and 39 of the Code of Civil Procedure, 1908.

 IN THE HIGH COURT OF BOMBAY (NAGPUR BENCH)

Writ Petition Nos. 6066 and 4682 of 2012

Decided On: 16.02.2018

Gemini Bay Transcription Private Ltd. and Ors. Vs. Integrated Sales Service Ltd. and Ors.

Hon'ble Judges/Coram:

R.K. Deshpande, A.S. Chandurkar and M.G. Giratkar, JJ.

Author: A.S. Chandurkar, J.

Citation:  MANU/MH/0265/2018, AIR 2018 BOMBAY 89, (2018) 2 MAH LJ 329.

Print Page

Sunday, 29 October 2023

Whether service of scanned copy of arbitral award by email is valid service of signed copy of award so as to start limitation for filing an application U/S 34 of Arbitration Act?

When scanned signed copy of order dated 07th March, 2018 was received by petitioner by email dated 22nd May, 2018 and scanned signed copy of Addendum to Award dated 17th May, 2018 was received by the petitioner on 17th May, 2018 itself, the same was valid delivery in terms of Section 31(5) of the Arbitration Act. The law has to keep its pace in tandem with the developing technology. When service by email is an accepted mode of service, then sending scanned signed copy of the award/order of the Arbitral Tribunal to the parties would be a valid delivery as envisaged under Section 31(5) of the Arbitration Act. {Para 47}


48. A Division Bench of this Court in the case of Delhi Urban Shelter Improvement Board Vs. Lakhvinder Singh MANU/DE/1290/2017 has held that the expression 'signed copy' in Section 31(5) of the Arbitration Act indicates the legislative intent that a copy authenticated by the Arbitrator is served on each party. It was held that authenticity of correspondence in the technologically advanced times of today does not necessarily pertain to only signatures in writing, and it would be adverse to read the expression 'signed copy' of the award/order in a restrictive manner so as to connote a copy bearing the original signatures of the Arbitrator in his hand writing. Thus, it was held as follows:


"15. The reference to the case of ARK Builders Private Limited (supra) where there was a dispute as to the delivery of a copy of the award by the arbitrator, by the Appellant would be inapplicable since, in the present case, the delivery of the copy of the award is not in contention. The only question is whether the copy of the impugned award, delivered to DUSIB by the arbitrator was a signed copy. 


16. As observed by the Single Judge, the expression 'signed copy' in Section 31(5) clearly indicates the legislative intent that a copy authenticated by the arbitrator is served on each party. The purpose of enacting the said provision is clearly to ensure that the parties receiving the award are in a position to act on the same. Emphasizing on this legislative intent, the Single Judge elaborated on how the authenticity of correspondence in the technologically advanced times of today does not necessarily pertain to only signatures in writing, and it would be adverse to read the expression "signed copy of the award" in a restrictive manner as to connote a copy bearing the original signatures of the arbitrator in his handwriting. 

49. Considering the aforesaid, it is clear that valid delivery of the Addendum to Award dated 17th May, 2018 and order dated 07th March, 2018 took place respectively on 17th May, 2018 and 22nd May, 2018 in terms of Section 31(5) of the Arbitration Act. Thus, the period of limitation for filing of petition under Section 34 of the Arbitration Act in the present case commenced on 22nd May, 2018. Thus, the limitation period for filing the present petition was till 22nd August, 2018.

 IN THE HIGH COURT OF DELHI

O.M.P. (Comm.) 377/2018

Decided On: 23.08.2023

Ministry Of Youth Affairs And Sports, Dept. of Ports, Govt. of India Vs. ERNST and Young Pvt. Ltd. (Now Known As ERNST and Young LLP) and Ors.

Hon'ble Judges/Coram:

Mini Pushkarna, J.

Citation:  MANU/DE/5541/2023.

Print Page

Sunday, 19 March 2023

Delhi HC: Arbitrator Can Declare Terms Of Contract Null, Even If No Declaration Is Sought By The Party In Its Pleadings

  It further held that because the rate of interest was left blank in Clause 60.8 (b) in the Appendix to the Bid to which a reference was made in the said clause. It was held to be uncertain and ineffective and therefore void under Section 29 of the Indian Contract Act.  {Para 24}

25. In the case of Oriental Structural Engineers Private Limited Vs. State of Kerala (2021) 6 SCC 150, manner of interpretation of Clause 60.8 of COPA, which is the subject matter of the present Award, came up for consideration. The plea of the rate of interest being left blank was specifically considered and the contention of the respondent was that not specifying the rate of interest and leaving it blank in the Appendix document amounted to a waiver and no interest was payable on any amount. Rejecting this plea, it was held that once there was a clause for levy of interest, merely because the rate of interest was not specified it would not amount to waiver but the Arbitrator, exercising his discretion, could award the interest at any reasonable rate. In the said case, the learned Arbitrator granted simple interest @ 8 % which was upheld by the Apex court.

26. The Arbitral Tribunal interpreted the terms of the contract and while rejecting the claim of the petitioner for compound Interest, it gave various reasons in which the clause providing for interest was also considered and held to be defunct, null and void being incomplete and vague. The objections of the Appellant that there being no pleading seeking clause 60.8 (b) to be declared null and void, the Ld. Arbitrator has made out a 3rd case in itself, is totally not tenable as it was within the domain of the Arbitrator to interpret the terms of the contract. The Tribunal exercised its discretion on the rate of interest to be granted, in absence of an agreement to this effect. The MajorityAward has given a well reasoned Award while granting simple interest.

 IN THE HIGH COURT OF DELHI AT NEW DELHI

Pronounced on: 13th March, 2023

 OMP (COMM.) 283/ 2021

M/S. MODI CONSTRUCTION COMPANY Vs M/S IRCON INTERNATIONAL LIMITED

CORAM:

 MS. JUSTICE NEENA BANSAL KRISHNA

Citation: 2023/DHC/001790

Print Page

Friday, 9 December 2022

Whether Court Can Condone the Delay in Re-filing the Application to Set Aside A Domestic Award Beyond 3 months and 30 days?

 The cases of delay in re-filing are different from cases of delay in filing inasmuch as, in such cases the party has already evinced its intention to take recourse to the remedies available in courts and has also taken steps in this regard. It cannot be, thus, assumed that the party has given up his rights to avail legal remedies. However, in certain cases where the petitions or applications filed by a party are so hopelessly inadequate and insufficient or contain defects which are fundamental to the institution of the proceedings, then in such cases the filing done by the party would be considered non est and of no consequence. In such cases, the party cannot be given the benefit of the initial filing and the date on which the defects are cured, would have to be considered as the date of the initial filing. A similar view in the context of Rules 1 & 2 of Chapter IV of the Delhi High Court (Original Side) Rules, 1967 was expressed in Ashok Kumar Parmar v. D.C. Sankhla: MANU/DE/0672/1994 : 1995 RLR 85, whereby a Single Judge of this Court held as under:-


Looking to the language of the Rules framed by Delhi High Court, it appears that the emphasis is on the nature of defects found in the plaint. If the defects are of such character as would render a plaint, a non-plaint in the eye of law, then the date of presentation would be the date of re-filing after removal of defects. If the defects are formal or ancillary in nature not effecting the validity of the plaint, the date of presentation would be the date of original presentation for the purpose of calculating the limitation for filing the suit. {Para 16}

 IN THE HIGH COURT OF DELHI

FAO (OS) 485-86/2011

Decided On: 07.11.2013

 Delhi Development Authority  Vs. Durga Construction Co.

Hon'ble Judges/Coram:

Badar Durrez Ahmed and Vibhu Bakhru, JJ.

Author: Vibhu Bakhru, J.

Citation: MANU/DE/4933/2013

Print Page

Sunday, 24 April 2022

Whether the order of the arbitrator refusing to entertain a counterclaim is the interim award?

 Section 34 of the 1996 Act allows recourse to a Court against any "arbitral award". "Arbitral award" is defined in Section 2(1)(c) as including an interim award. {Para 9}

10. "Interim award" is, however, not defined in the 1996 Act. Section 31(6) of the 1996 Act, however, empowers an Arbitral Tribunal to make an interim award on any matter with respect to which it may make a final arbitral award. Section 31(6) of the 1996 Act reads thus:

"The arbitral tribunal may, at any time during the arbitral proceedings, make an interim arbitral award on any matter with respect to which it may make a final arbitral award."

11. Inasmuch as an interim award is also an "arbitral award" as defined in Section 2(c), an interim award would be susceptible to challenge under Section 34 of the 1996 Act. This fact was noticed by the Supreme Court in Indian Farmers Fertilizer Cooperative Ltd. v. Bhadra Products MANU/SC/0026/2018 : (2018) 2 SCC 534 (IFFCO, hereinafter). The issue before the Supreme Court, in that case, was whether an order rejecting a claim on the ground of limitation, could be treated as "interim award", so as to make the order amenable to challenge under Section 34 of the 1996 Act. The Supreme Court, in IFCO MANU/SC/0026/2018 : (2018) 2 SCC 534, while noticing that the 1996 Act does not define "interim award", proceeded to opine as under:

"7. As can be seen from Section 2(c) and Section 31(6), except for stating that an arbitral award includes an interim award, the Act is silent and does not define what an interim award is. We are, therefore, left with Section 31(6) which delineates the scope of interim arbitral awards and states that the arbitral tribunal may make an interim arbitral award on any matter with respect to which it may make a final arbitral award."

8. The language of Section 31(6) is advisedly wide in nature. A reading of the said sub-section makes it clear that the jurisdiction to make an interim arbitral award is left to the good sense of the Arbitral Tribunal, and that it extends to "any matter" with respect to which it may make a final arbitral award. The expression "matter" is wide in nature, and subsumes issues at which the parties are in dispute. It is clear, therefore, that any point of dispute between the parties which has to be answered by the arbitral tribunal can be the subject matter of an interim arbitral award. However, it is important to add a note of caution. In an appropriate case, the issue of more than one award may be necessitated on the facts of that case. However, by dealing with the matter in a piecemeal fashion, what must be borne in mind is that the resolution of the dispute as a whole will be delayed and parties will be put to additional expense. The arbitral tribunal should, therefore, consider whether there is any real advantage in delivering interim awards or in proceeding with the matter as a whole and delivering one final award, bearing in mind the avoidance of delay and additional expense. Ultimately, a fair means for resolution of all disputes should be uppermost in the mind of the arbitral tribunal.

12. In my view, the import of the afore-extracted passages from the judgment of the Supreme Court in IFFCO MANU/SC/0026/2018 : (2018) 2 SCC 534 is clear and categorical. Any matter, on which an Arbitral Tribunal may make a final award, can also be subject of an interim award made by it. If, therefore, the decision of the Arbitral Tribunal brings a quietus to an issue before the Arbitral Tribunal, and is an order which the Arbitral Tribunal is empowered to pass at the final stage, it would constitute an "interim award" within the meaning of Section 31(6) and, consequently, within the meaning of Section 34 of the 1996 Act.

A decision that the counter-claim is not maintainable and is, therefore, liable to be rejected, is a decision which an Arbitral Tribunal can certainly take at the final stage of the proceedings, especially in view of the power conferred on the Arbitral Tribunal, by Section 16 of the 1996 Act, to rule on its own jurisdiction especially in view of the power conferred on the Arbitral Tribunal by Section 16 of the 1996 Act, to rule on its own jurisdiction. Being, therefore, in the nature of a decision which could be taken at the final stage of the proceedings, i.e. in the final award which the Arbitral Tribunal would pass, such a decision, when taken at an interlocutory stage, would, in my view, certainly constitute an "interim award" within the meaning of the 1996 Act, in view of the law laid down in IFFCO MANU/SC/0026/2018 : (2018) 2 SCC 534.

IN THE HIGH COURT OF DELHI

O.M.P. (COMM) 224/2021 and I.A. 9860/2021

 National Highways Authority of India Vs.  Abhijeet Angul Sambalpur Toll Road Limited

Print Page

Can the arbitrator refuse to entertain a counterclaim if it is not as per his liberty?

 The right of the petitioner to file counter-claims exists independent of any liberty granted by the learned Arbitral Tribunal. It is always open to the learned Arbitral Tribunal to reject the counterclaims either on merits or on limitation or even on the ground that they are not arbitrable within the scope of the reference made to learned Arbitral Tribunal, in exercise of the powers conferred by it by Section 16 of the 1996 Act1, which empowers an Arbitral Tribunal to rule on its own jurisdiction. The learned Arbitral Tribunal could not, however, take a view that it would not entertain any such counter-claim, if preferred before it.

IN THE HIGH COURT OF DELHI

O.M.P. (COMM) 224/2021 and I.A. 9860/2021

 National Highways Authority of India Vs.  Abhijeet Angul Sambalpur Toll Road Limited

Hon'ble Judges/Coram:

C. Hari Shankar, J.

Decided On: 28.02.2022

Citation: MANU/DE/0735/2022

Print Page

Tuesday, 12 April 2022

Whether the Commercial court can call record from arbitral tribunal for deciding an application U/S 34 of Arbitration Act?

Perusal of Section 34 (2) (a) of the Act reveals that Court may

set aside the award if the party making the application establishes on
the basis of record of arbitral tribunal, meaning thereby that Court
can certainly go for perusal of the record and therefore, requisition of
record from arbitral tribunal is not akin to remanding the matter to
arbitral tribunal but to ascertain the exact nature of dispute through
record of case. Therefore, case of the petitioner is not supported by
relevant provision itself. {Para 19}
20. Since it is not a case of remand per se, therefore, judgments
relied upon by the petitioner are not applicable in the present set of
facts. The Commercial Court is within a domain to call for the record
from arbitral tribulnal for deciding the application under Section 34

(1) and (4) of the Act.
HIGH COURT OF MADHYA PRADESH
BENCH AT GWALIOR
:SINGLE BENCH:
{HON'BLE SHRI JUSTICE ANAND PATHAK}
Writ Petition No.4895/2022
Anil Kumar Tripathi Through its proprietor Vs. Doorsanchar Nigam Ltd. (BSNL)

(Passed on 8th day of April, 2022)
Print Page

Monday, 7 February 2022

Can a party challenge interest awarded by arbitrator U/S 34 of arbitration Act if there is no prohibition for granting an interest in an arbitration agreement?

 The contention that the arbitral award is vitiated as the

Arbitral Tribunal has awarded exorbitant interest is equally

unmerited. The Arbitral Tribunal has awarded interest at the rate of 12%per annum. The same cannot be considered by any stretch of imagination as exorbitant. The Hon’ble Supreme Court in a recent decision in Punjab State Civil Supplies Corporation Limited (PUNSUP) and Anr. v Ganpati Rice Mills: SLP (C) 36655 of 2016, decided on 20.10.2021, has held that the Arbitral Tribunal has wide discretion in awarding interest under Section 31(7)(a) of the A&C Act and the impugned award cannot be interfered with except on the ground as set out in Section 34 of the A&C Act. {Para 20}

21. There is no provision in the Agreement which prohibits

award of interest. Thus, the decision in Jaiprakash Associates

Ltd. Through Its Director v. Tehri Hydero Development

Corporation India Ltd. Through Its Director (supra) is clearly

inapplicable. In that case, the challenge to the arbitral award was

sustained as the contract between the parties prohibited grant of

any interest. Clearly, award of interest contrary to the express

terms of the agreement between the parties would be susceptible

to challenge under Section 34 of the A&C Act. But since there is

no agreement proscribing award of interest, the award of interest cannot be faulted.

 IN THE HIGH COURT OF DELHI AT NEW DELHI

 O.M.P. (COMM) 432/2019 and IA Nos. 14333/2019,

NATIONAL SEEDS CORPORATION LTD Vs NATIONAL AGRO SEEDS CORPORATION

CORAM:

HON'BLE MR. JUSTICE VIBHU BAKHRU

 Date of Decision: 05.01.2022

Print Page

Tuesday, 14 December 2021

Can an arbitrator award interest on delayed payment of the contractual amount in a government contract?

  In the case of Bright Power Projects (supra), it has been opined by this Court that unless otherwise agreed by the parties, the Arbitral Tribunal can award interest at reasonable rate for a period commencing from that date when the cause of action arises till the date of the award. In the dispute which forms the subject ­matter of this appeal, being the agreement, there was no specific exclusion of payment of interest on delayed payment in relation to the local currency component.


12. On the other hand, the specific term of the agreement entered into by and between the parties provided for payment of interest on delayed payment as terms of the contract. What was not specifically agreed upon was the rate at which such interest would be paid. The blank space in the “appendix to the bid”, in our opinion, cannot be construed as cancellation of the clause providing for payment of interest of delayed release of funds. We do not think the Appellate Court or the Arbitration Court was right in adopting the approach that by not specifying the blank space provided for filling in the interest rate. We are of the view that to come to such an inference, active exclusion of payment of interest under that head was necessary to have been incorporated in the agreement. Though the case of G.C. Roy (supra) was delivered in a dispute to which the 1940 Act was applicable, the Constitution Bench of this Court has laid down certain general proposition or principle on the aspect of grant of interest. This general proposition was referred to by the Tribunal. It has been held in paragraph 43.1 of the Report (in the case of G.C. Roy):­
“43. The question still remains whether arbitrator has the power to award interest pendent lite, and if so on what principle. We must reiterate that we are dealing with the situation where the agreement does not provide for grant of such interest nor does it prohibit such grant. In other words, we are dealing with a case where the agreement is silent as to award of interest. On a conspectus of aforementioned decisions, the following principles emerge:
(i) A person deprived of the use of money to which he is legitimately entitled has a right to be compensated for the deprivation, call it by any name. It may be called interest, compensation or damages. This basic consideration is as valid for the period the dispute is pending before the arbitrator as it is for the period prior to the arbitrator entering upon the reference. This is the principle of Section 34, Civil Procedure Code and there is no reason or principle to hold otherwise in the case of arbitrator.....”

13. The underlying principle guiding award of interest is that interest payment is essentially compensatory in nature. But as we have already observed, in the case before us, interest on delayed payment formed part of the contract itself. The agreement did not contain any express exclusion clause on payment of interest on delayed payment whether on component of payment in foreign currency or local currency. We accept the reasoning of the Tribunal on the basis of which it rejected the respondents’ plea of waiver. 

Supreme Court

JUSTICE SURYA KANT JUSTICE ANIRUDDHA BOSE

M/s. Oriental Structural Engineers Pvt. Ltd. Vs. State of Kerala

CIVIL APPEAL NO. 3454 OF 2011

22nd April 2021

Author: ANIRUDDHA BOSE, J.

Citation: 2021 ALL SCR (ONLINE) 242

Print Page